GovBidAlerts
← My Opportunities
IFBclosed🌐 Virginia (eVA)HDW-19-102

Construction of the Water System Improvements Phase 1A

Town of Hillsboro

Description

The principal features of the Work to be performed under this Contract includes: a new well pump for Well No. 2, which will replace the existing Spring (to be removed from service); improvements to the existing Hillsboro Water Treatment Plant (WTP), including piping, pumping, architectural, electrical and controls improvements, and a 15,000 gallon cast-in-place concrete storage tank; and raw and potable water mains connecting Well No. 2 to the existing system. We are having a Mandatory Pre-Bid Conference on April 8th, 2019.

Details

Posted
Apr 18, 2019
Response deadline
Apr 29, 2019, 3:00 PM UTC
Type
IFB
Category
Construction
Status
closed
Buyer
Town of Hillsboro
Jurisdiction
Virginia (eVA)
Location
Town of Hillsboro
Reference #
HDW-19-102
App
VBO
Agency
L524
Doctype
SO
Version
3
Commcode
91356, 91360
Commdesc
Construction, Utility/Underground Projects, Construction, Water System/Plants, Main and Service Line
Longdesc
The principal features of the Work to be performed under this Contract includes: a new well pump for Well No. 2, which will replace the existing Spring (to be removed from service); improvements to t
Doccddesc
Invitation for Bids (IFB)

Contact

Alison Badger
Finding similar opportunities…

This listing is a summary from Virginia (eVA)'s open procurement data. We ingest every field the feed publishes; the full solicitation documents are on the source portal.

Raw record
{
  "id": "VBO:IFB:L524:147784",
  "app": "VBO",
  "doccd": "IFB",
  "agency": "L524",
  "status": "Closed",
  "doctype": "SO",
  "pubdate": "2019-04-18T16:00:00Z",
  "version": "3",
  "workloc": "Town of Hillsboro",
  "category": "Construction",
  "commcode": [
    "91356",
    "91360"
  ],
  "commdesc": [
    "Construction, Utility/Underground Projects",
    "Construction, Water System/Plants, Main and Service Line"
  ],
  "longdesc": "The principal features of the Work to be performed under this Contract  includes: a new well pump for Well No. 2, which will replace the existing Spring (to be removed from service); improvements to the existing Hillsboro Water Treatment Plant (WTP), including piping, pumping, architectural, electrical and controls improvements, and a 15,000 gallon cast-in-place concrete storage tank; and raw and potable water mains connecting Well No. 2 to the existing system. We are having a Mandatory Pre-Bid Conference on April 8th, 2019.",
  "_version_": 1747861000245215200,
  "amenddate": "2019-04-18T16:00:00Z",
  "buyername": "Alison Badger",
  "closedate": "2019-04-29T15:00:00Z",
  "doccddesc": "Invitation for Bids (IFB)",
  "docdeptcd": "L524",
  "shortdesc": "Construction of the Water System Improvements Phase 1A",
  "agencyname": "Town of Hillsboro",
  "externalid": "HDW-19-102",
  "internalid": "147784",
  "lastupdatedate": "2019-04-29T19:00:19Z",
  "categoryshortdesc": "Construction",
  "openresponsesdate": "2019-04-29T15:00:00Z"
}